Wetpour rubber surfacing pairs a shock-absorbing SBR base with a UV-resistant EPDM wear layer bound by polyurethane, forming a seamless, non-slip playground skin . Safety depends on a ≥30 mm base, a 16 % binder in the base and 22 % in the wear layer to keep impact absorption and flexibility in balance . Choosing the right granule size (1-4 mm), curing in dry 15-25 °C weather, and using recycled rubber trim wear, cut landfill waste and, with routine cleaning, give a 10-15-year service life 

Understanding Wetpour System Composition

The system composition of wet pour rubber surfacing is essential to its functionality, durability, and performance for playgrounds across Ireland. At its core, a wetpour system incorporates high-quality rubber granules cohesively bonded by a polyurethane binder, all applied onto a supportive base. This composition not only ensures durability but also advances ecological sustainability by integrating recycled materials, particularly SBR granules derived from repurposed tyres.

Our systems at Playground Repair Ltd are meticulously engineered to provide a seamless, safe, and aesthetically pleasing surface. The installation features a layered structure:

  • A robust base layer made of Styrene-Butadiene Rubber (SBR) granules for exceptional shock absorption.
  • A durable wear layer composed of Ethylene Propylene Diene Monomer (EPDM) or Thermoplastic Vulcanisate (TPV) rubber granules for UV resistance and vibrant colour.

This stratified construction creates a resilient surface with a lifespan of 10-15 years, making it a cost-effective and safe solution for any high-traffic play area in Ireland.

The Foundational Base Layer

The base layer is the foundational component of any wet-pour rubber surfacing system, and its integrity directly impacts the safety and effectiveness of the playground. Its primary function is to cushion impacts and mitigate injuries from falls. At Playground Repair Ltd, we use 100% recycled Styrene Butadiene Rubber (SBR) for our base layers, providing an environmentally friendly and highly effective shock-absorbing solution.

To comply with EN 1177 safety standards, the base layer thickness must be tailored to the critical fall height of the play equipment, with a recommended minimum thickness of 30mm for most playground applications in Ireland. With proper installation and maintenance, this SBR base layer can last for over a decade, providing consistent safety performance.

SBR Buffings and Alternative Base Materials

SBR buffings, a byproduct of the tyre recycling process, are an innovative and cost-effective base material. They offer superior mechanical properties, including approximately 57% higher tensile strength compared to conventional options. While premium alternatives like EPDM can be used for a base, SBR provides the best balance of performance, safety, and cost for most projects in Ireland, all while promoting a circular economy by reducing landfill waste.

Base-Layer Binder Characteristics and 16% Mix Ratio

The performance of the base layer is critically dependent on the binder. We use a high-viscosity polyurethane binder mixed at an optimal 16% ratio by weight. This specific proportion ensures a perfect balance between workability and mechanical strength, enhancing the layer's resistance to deformation. Deviating from this ratio can compromise the permeability and structural integrity of the base, which is why our certified installers in Ireland adhere to this standard meticulously.

The Durable Wear Layer

The wear layer is the top protective element of the wetpour system, providing durability, slip resistance, and vibrant colour. This layer is typically composed of premium EPDM rubber granules mixed with a polyurethane binder to form a tough, non-slip surface that withstands the rigors of daily play and the Irish climate.

For playgrounds, a standard wear layer thickness of 15mm is recommended, which provides a durable surface that can last 10-15 years. The high-quality EPDM granules are resistant to UV radiation, preventing fading and degradation over time. This ensures the playground remains both safe and visually appealing.

EPDM & TPV Granule Sizes and Curing Time

The size of the EPDM or TPV granules, typically ranging from 1mm to 4mm, is crucial for performance. A well-selected granule size balances user comfort with durability and impact attenuation. The curing time for the binder is also critical, generally requiring 24-48 hours under optimal conditions (15°C to 25°C with low humidity). Our teams carefully plan installations around the weather to ensure a perfect cure every time.

Granule Components (EPDM, Sulfur, Oils, Additives, Pigments, Fillers)

The performance of our EPDM granules is determined by a precise formulation of key components. This includes EPDM rubber for durability, sulfur for vulcanization (which enhances elasticity and strength), specialized oils and additives for flexibility, high-quality pigments for vibrant, lasting colour, and fillers like calcium carbonate to improve mechanical properties and impact resistance.

Wear-Layer Binder Mix Ratio (22%)

For the EPDM wear layer, a higher binder mix ratio of 22% by weight is essential. This specific ratio provides the optimal balance of flexibility and durability, ensuring the surface can withstand daily use and environmental stress without cracking or granulating prematurely. This standard is crucial for maintaining the safety and longevity of playgrounds across Ireland.

Binder Types & Selection

Choosing the right binder is a critical decision that impacts the longevity, aesthetics, and cost of your playground surface. The two main types of polyurethane binders used in wetpour applications are Aromatic and Aliphatic.

Base Layer Binder (Cost-Cutting, Limitations)

For the SBR base layer, a cost-effective binder is typically used. While it's possible to cut costs with cheaper binders, Playground Repair Ltd advises against it. Inferior binders often fail to meet performance standards, leading to reduced durability, poor environmental resistance, and compromised safety. This can void warranties and lead to higher maintenance costs in the long run.

Aromatic Binder (Ambering, Seasonal Formulas)

Aromatic binders are the industry standard for most applications, used in about 90% of poured-in-place installations due to their excellent adhesive properties and cost-effectiveness. Their main drawback is a susceptibility to UV radiation, which causes a yellowing effect known as "ambering" over time. This is why we primarily recommend Aromatic binders for use with dark-coloured granules (black, brown, red), where this colour shift is unnoticeable.

Aliphatic Binder (UV & Chemical Resistance, Cost)

Aliphatic binders are a premium, fully UV-stable option. They do not yellow or amber over time, making them the essential choice for projects using brightly coloured EPDM granules (blues, greens, yellows, etc.). They also offer superior chemical resistance, ideal for splash pads or pool decks. While the initial cost is higher, the long-term colour vibrancy and durability justify the investment for high-visibility projects in Ireland.

Choosing the Right Binder (Color, Budget, Environment)

Playground Repair Ltd helps you choose the right binder by balancing three factors:

  • Colour: For bright, vibrant designs, Aliphatic binder is a must. For dark or earthy tones, Aromatic binder is the smart, cost-effective choice.
  • Budget: We provide transparent quotes to help you understand the cost-benefit of each binder type for your project.
  • Environment: We consider the local Ireland climate and environmental exposure to recommend the binder that will offer the best long-term performance.

Impact Attenuation & System Thickness

The single most important safety function of a playground surface is impact attenuation, its ability to absorb shock and reduce the severity of head injuries from falls. This is governed by the system's thickness and is regulated by the ASTM F1292 standard.

Base Layer Thickness vs Critical Fall Height

The required thickness of the SBR base layer is directly determined by the Critical Fall Height (CFH) of the tallest piece of play equipment. The higher the potential fall, the thicker the base layer must be to absorb the impact safely. For example, a 4-foot CFH may require a 4-inch base layer, while a 12-foot CFH could require a base up to 5 inches thick. Our team calculates the precise thickness needed to ensure your playground is fully compliant and safe.

Factors Affecting Impact Performance

Beyond thickness, impact performance is affected by climate conditions, foot traffic, installation quality, and maintenance. Extreme temperatures can make rubber brittle or soft, while poor installation can create hard spots. Regular maintenance ensures the surface retains its protective qualities throughout its lifespan.

Maximum Practical Thickness Limit (≤6in)

While thicker is often safer, there is a maximum practical thickness limit of around 6 inches for wetpour surfacing. Exceeding this can lead to installation complexities and drainage issues without providing significant additional safety benefits. We engineer every system to provide optimal safety within this practical limit.

Site Preparation for Installations in Ireland

A successful wetpour installation begins with meticulous site preparation. This foundational phase ensures the longevity and performance of the final surface.

Concrete or Asphalt Substrates (28-Day Cure Requirement)

If installing over a new concrete or asphalt base, it is critical to allow for a full 28-day curing period. This ensures the substrate has reached its required compressive strength and that all moisture has evaporated. Installing a wet pour system prematurely on an uncured base can lead to adhesion failure and voids the warranty.

Aggregate Substrate Construction

For most new installations in Ireland, we construct an aggregate substrate. This involves:

  • Excavation and Organic Removal: The site is excavated to the required depth (typically a minimum of 150mm), and all organic material like turf and roots is removed.
  • Stone Base Installation & 95% Compaction: A layer of crushed stone (MOT Type 1) is installed and mechanically compacted to 95% of its maximum density. This creates an incredibly stable and free-draining foundation.
  • Optional Geotextile Layer: We often install a geotextile membrane between the soil and the stone base. This fabric layer prevents the two layers from mixing, enhances stability, and improves drainage performance.

Drainage and Surface Pitch

Proper drainage is essential. We engineer every installation with a precise surface pitch, typically a 2% slope, to ensure water runs off effectively. This prevents puddling, which can lead to premature degradation, moss growth, and slip hazards, especially during wet Irish winters.

The Installation Process

Playground Repair Ltd follows a proven, systematic installation process to ensure a perfect finish every time.

Base Layer Installation

Once the sub-base is prepared, the SBR base layer is installed. The SBR granules are mixed with binder and troweled to the precise thickness required to meet the CFH safety rating for your specific play equipment.

Mixing Procedure and Equipment (Mortar Mixer)

We use high-capacity, forced-action mortar mixers to ensure a completely homogeneous blend of rubber granules and binder. Each batch is mixed for a consistent 4-6 minutes to achieve the perfect workability and strength.

Spreading, Troweling & Compaction Techniques

Our skilled technicians expertly spread and hand-trowel the mixture to a uniform depth. This is followed by mechanical compaction with a roller to ensure a dense, stable, and smooth base layer, free of air voids.

Base Layer Curing Considerations

The base layer must be allowed to cure for 24-48 hours before the wear layer can be applied. We carefully monitor temperature and humidity to ensure a proper cure, which is essential for the final bond and system integrity.

Wear Layer Installation

The final step is the installation of the EPDM wear layer, which provides the colour, texture, and durability for your playground.

Consistent EPDM + Binder Mixing to Avoid Discoloration

To prevent colour variations, batch timing and mixing consistency are paramount. Every batch of EPDM and Aliphatic/Aromatic binder is mixed for the exact same duration to ensure a perfectly uniform colour across the entire surface.

Troweling, Closing Granules & Finish Quality

The final troweling is an art form. Our technicians skillfully work the surface to close the granules, creating a smooth, non-porous finish that is both safe and aesthetically pleasing. The quality of this final trowel determines the look and feel of the playground for years to come.

Increased Thickness in High-Traffic Zones

For areas that will experience heavy use, such as under swings or at the bottom of slides, we can install an increased thickness of the wear layer (e.g., 20mm instead of 15mm). This provides extra durability where it's needed most, extending the life of the surface.

Wear-Layer Curing Time

After the final trowel, the wear layer requires a full 24-48 hours to cure before it can be opened for foot traffic. We will advise on the specific curing time based on the conditions at your site to ensure a perfect, durable finish.

Priming & Adhesion Enhancement

To ensure a powerful, lasting bond between the wetpour system and the sub-base (especially on concrete or asphalt), proper priming is essential.

Primer Types (Diluted Binder, Commercial)

We use professional-grade polyurethane primers designed for wet-pour applications. Unlike simple diluted binders, commercial primers provide superior adhesion and moisture-blocking properties, ensuring the system will not delaminate over time.

Application Methods and Masking

The primer is carefully applied with rollers or brushes. We use precise masking techniques to ensure clean, crisp edges, which is especially important for projects with intricate designs or multiple colours. This attention to detail is a hallmark of a Playground Repair Ltd installation.

Mixing & Troweling Best Practices

Our commitment to quality is evident in our strict adherence to best practices.

Accurate Binder Weighing (Fish Scale)

We don't estimate; we measure. Every batch of binder is accurately weighed using calibrated scales to ensure the precise mix ratio is achieved every single time. This guarantees consistent performance across the entire playground surface.

Tool Lubrication with Soapy Water

To achieve a perfectly smooth, glass-like finish, our technicians constantly lubricate their trowels with a mild soapy water solution. This simple but critical step prevents the trowel from dragging or pulling at the EPDM granules, ensuring a flawless surface.

Batch Timing Consistency

From the first batch of the day to the last, our mixing times are strictly monitored. This consistency is the key to avoiding colour variations and ensuring that the entire surface cures uniformly, resulting in a strong, seamless, and beautiful final product for your Irish playground.

Specialized Services

Pool Deck & Patio Surfacing

Upgrade your poolside and patio areas with a stylish and slip-resistant rubber surface. Wetpour is an ideal choice for wet areas, providing excellent grip underfoot to prevent accidents. It's also comfortable to walk on, stays cooler than concrete in the summer sun, and can be customized to match your home's aesthetic, creating a seamless and safe outdoor living space.

Driveway & Walkway Rubber Surfacing

Enhance your home's curb appeal with a modern and resilient rubber driveway and walkway. Our wetpour surfacing is a durable alternative to traditional asphalt or concrete, resistant to cracks, oil, and frost. Its permeable nature allows for excellent drainage, and with a variety of color options, you can create a unique and welcoming entrance to your property.

Home Gym & Fitness Flooring

Create the perfect workout environment with our specialized home gym flooring. This durable rubber surface provides excellent shock absorption, protecting your joints during high-impact exercises and your subfloor from dropped weights. It’s also easy to clean and offers great sound insulation, making it the ideal foundation for any personal fitness space.

School & Nursery Playground Surfacing

We provide safe, durable, and stimulating playground surfaces for schools and nurseries, fully compliant with all safety standards. Our wetpour installations are designed to absorb impact and minimize injuries, creating a secure environment for children's play and learning. With endless design and color possibilities, we can help you create an engaging and inspirational outdoor space.

Public Park & Recreational Area Surfacing

Enhance community spaces with our hard-wearing and attractive wetpour surfacing for public parks and recreational areas. Designed to withstand high foot traffic and all weather conditions, our installations provide a safe, accessible, and low-maintenance solution for councils and community groups looking to improve their public facilities.

Sports Facility & MUGA Pitch Surfacing

Our high-performance wetpour surfacing is ideal for Multi-Use Games Areas (MUGAs) and other sports facilities. It offers excellent grip, durability, and shock absorption, making it suitable for a variety of sports like basketball, tennis, and netball. We can incorporate custom line markings to create a versatile and professional-grade athletic surface.

Leisure Centre & Water Park Flooring

Ensure guest safety in high-traffic wet areas with our slip-resistant rubber flooring. Perfect for pool surrounds, splash pads, and changing rooms in leisure centers and water parks, our wetpour surfacing provides superior grip and comfort underfoot. It is also resistant to chlorine and UV rays, ensuring longevity and a vibrant appearance.

Healthcare & Assisted Living Facility Walkways

Improve safety and accessibility for patients, residents, and staff with our cushioned walkway surfacing. Ideal for healthcare and assisted living facilities, the impact-absorbent nature of wetpour reduces strain on joints and minimizes the severity of fall-related injuries, creating safer and more comfortable outdoor pathways.